14_moisture_barrier

Once the grid was set, I removed the boards (after marking them carefully!) and laid down a sheet of 4mm plastic to act as a moisture barrier. Hopefully this will improve the heat retention of the control room, and prevent the concrete pad from acting as a heat sink during the winter.