9933_sheetrock_walls

Finally all the walls and ceiling are covered in drywall, and it's time for the step I've been dreading the most: mudding. Semi-liquid joint compound (or "mud") needs to be applied to all the gaps, cracks, screw holes and transition joints over the entire room (and ceiling - ugh!)